TGS has announced two multi-client geochemical seafloor sampling and seep studies offshore Canada and in the Barents Sea. Sampling locations for both programs were identified using recently acquired multi-client seismic data.
Paradigm® announced today that it has released the latest version of its industry-leading Geolog® formation evaluation and petrophysics analysis solution suite. The release includes a plug-in that enables direct data transfer from Geolog to Petrel* seismic to simulation
The technology of water shutoff treatment with cutting out part of the production casing is successfully applied at TATNEFT Company for oil recovery enhancement.
The Gazprom Board of Directors approved the report on the progress in 2013 with Gazprom's Innovative Development Program until 2020.
Gazprom Group goes on allotting considerable funds for R&D financing.
Tomsk Technical University (TPU) specialists will work on a software and hardware package for areal study of the seabed, to search for mineral resources. The technology has the greatest potential with regard to exploration of the Arctic shelf reserves.
Total plans to drill Denmark's first test wells for shale gas in December or January, the French energy firm said on Friday, following its deals to explore for unconventional hydrocarbons in Britain and Russia.
The TD-5100 ECA Scrubber Wash Water Overboard Discharge Monitor from Turner Designs Hydrocarbon Instruments helps protect the environment from unwanted high levels of contamination in exhaust gas scrubber washwater discharge.
Leading manufacturer of professional communication systems for safety on land, sea and air Jotron has announced the launch of its floating multi-functional Tron TR30 GMDSS VHF handheld radio.
Air charter and logistics services provider Volga-Dnepr Airlines has delivered a mobile 24m-high drilling rig from Novy Urengoy to Mirny, Russia for Verkhnechonskoe oil-gas condensate field. The rig was loaded on-board the company's AN-124-100 Ruslan freighter.
When designing and modifying offshore structures, taking wind loads on equipment into account has been a complicated task for engineers.