Specialist Pipeline Pig Proves Pipeline is Ready for Inspection

16 inch PECAT™

July 15, 2014

inspection produced a full set of results.

Implementation of a specific progressive cleaning programme followed by running PECAT™ through the line proved to the operator that it was ready for inspection, ensuring they avoided the high expense, both in time and operational costs, of carrying out an ineffective ILI.

Source: Circor Energy – Pipeline Engineering