Lukoil will increase associated gas utilization to 95%, as stipulated by the government, by the end of 2014, Lukoil board chairman Valery Grayfer has told an economic forum on the Caspian region.
Varyeganneft, a subsidiary of Russneft, in 2013 commissioned a pipeline from the preliminary water removal unit of the West-Varyeganskoye block to the Varyeganskoye compressor station No 3, with a supply pipeline from the Roslavl deposit